Usually the list includes but is not limited to: quality control & quantity check of executed works (structural steel or reinforced-concrete structures, building safety, HVAC & electrical systems, plumbing, water and fire proofing, elevators, etc.) according contract agreements, detailed design and existing norms and regulations(including changes during the construction process , technical sheets and sample materials control, daily logs, including photographs taken during execution, field inspection and testing, and final checkout of the facility. |
 |
|